Project

General

Profile

Fabric Group by Dept

It is possible to hold the cost price by the department for each stock item.
This means that when the BOM is calculated, the program needs to look at the department record within the stock item to see if there is a cost price there.

There is already a ‘Fabric Group by Dept’ tab in the stock record, so the cost price is held here.